Workshop 2 – CPR / forbidden outdoor cables inside buildings

18 mai 2017

Thursday 18 May 2017 AFOR organized the 2nd Workshop in Slatina. Theme: ” CPR- or the ban on using indoor the outdoor cables starting with 1st July 2017″.

As special guests were ASRO and OICPE (Independent Body for Certification of Electric and Electronic Products). It was talked about what CPR Regulation 305/2011 (Construction Product Regulation) and fire safety of cables, which are treated at the pile ( electrical cables, communication cables: CATV, copper and optical fibers). All cables and their 7 classes are to be marked with the CE marking and one of the first 6 classes starting 1st July 2017.

MINUTA                                                                          Date: May 18, 2017

2nd Workshop: CPR or outdoor fiber optic cables forbidden to be installed inside buildings                                     starting 1st July 2017

Location: Slatina, fiber optic cable factory Prysmian

Participants: 21 people from:

  • MCSI,
  • ASRO
  • OICPE (Independent Body for Certification of Electric and Electronic Products)
  • AFOR and 2 of its members: Prysmian and R & M (manufacturers)
  • 5 telecom operators (RCS & RDS, Telekom Romania, Vodafone, GTS Telecom and Euroweb) and
  • 2 operators of power distribution networks (ENEL and Electrica Distribution Muntenia North).

Mrs. Bontea’s message from MDRAP regarding the subject of this workshop, with some clarifications:

1.       The information point is on the MDRPFE website: http://www.mdrap.ro/constructii/-4218/-8393 or e-mail address: infoprod_constructii@mdrap.ro

2.       Extract from HG (Governamental Decision) No.622/2004 on the marketing of construction products, with modifications:
CAP. VII  Designated and notified bodies

ART. 27

(1) For the execution of the procedures for attesting the conformity of the products, certification bodies, inspection bodies and test laboratories are designated and notified.
(2) The competent authority for the designation of the bodies involved in attesting the conformity of the products is the Ministry of Development, Public Works and Housing, except the specialized bodies on families of products with role in satisfying the fire safety requirement, for which the competent authority for designation is the Ministry of Interior and Administrative Reform.

The workshop agenda was as follows:

10.00 – 10.15: introduction to the theme + presentation of participants

10.15 – 10.25: Follow-up Workshop previous + setting goals for the next 2 workshops

10.25 – 10.35: ASRO presentation – Regulation 305/2011 (CPR) and SR EN 50575

10.35 – 10.45: perspective of FO – AFOR cable users (the undersigned will present the material sent by Catalin Chivu from Switzerland / Swiscom)

10.45 – 11.00: perspective of a test laboratory on outdoor versus indoor horse classes – Mr. Turcu (OICPE)

11.00 – 11.10: Prysmian’s perspective as a cable manufacturer on CPR

11.00 – 11.15: Coffee break

11.15 – 13.00: discussions in the room. Purpose: list of measures necessary for the adoption in Romania of CPR for fiber optic cables

13.00 -13.30: Conclusions

13.30:  Lunch

The discussions and the program from the first workshop were mentioned, regarding the installation of fiber optic cables in Romania, with the related standards (of which the most important is SR EN 50174-3: 2014) and 3 working groups were established for the following period, to which each participant is invited to register:

1. Design of fiber optic networks – coordinator Paul Esanu
2. CPR – coordinator Cezar Lovin
3. Weak currents (norm I18 / 1-2001) – coordinators Dorin Coman and Cornel Barbut

– The presentation of ASRO scored among others:

The CPR (Construction Product Regulation) Regulation no. 305/2011 deals with the second fundamental requirement of a product, namely fire safety and fire reaction of “electric cables” (in the name “electrical cables” enters electric cables, communication cables (type coaxial or copper) and fiber optic cables)
CPR 305 has 6 application support standards, of which only SR EN 50575: 2015 is the only harmonized standard.
The CPR regulation is not only a standard that is optional, but is mandatory in the EU territory from 10.06.2016 and the marking of cables with CE is mandatory from 1.07.2017.
CPR 305/2011 refers to a requirement of the product to be tested and mentioned in a Declaration of Performance (DoP)
SR EN 50575: 2015 talks about several features of cables, including Fire Reaction (FIGRA) and Release of Dangerous Substances

– AFOR pointed out, among others, in the presentation from the perspective of a communications operator (SWISCOM from Switzerland) that the definition of buildings / spaces / escape lanes in case of fire is made by each country! For example, Italy is applying for the Bca class in Indoor, while Germany is demanding the Cca and Bca class (own classification) inside the buildings. As general recommendations:

Class F: for outdoor cables
Class D: In spaces / buildings / horizontal evacuation color (average degree of protection)
Class C: In spaces / buildings / vertical evacuation color (high degree of protection)

– The presentation of the OICPE highlighted, among others, the following aspects:

OICPE has been operating since 2009 and from April 2017 is the only body accredited by RENAR for CPR on cables in Romania
In CPR all the underground constructions enter and not only the buildings. That is, the pillars (including the lighting ones) would enter here.

A series of questions were asked on the topic of discussion:

Do fiber optic cable accessories need to be marked or not?

§ Answer: Regulation 305/2011 does not provide anything for accessories (at least until now).

Are patches considered cables (should they also be marked)?

§ Answer: No. But in practice all are LSZH (Low Smoke Zero Halogen).

What about old cables or ongoing projects (and OPGWs in the Electrica network)?

§ Answer: They remain as they are. The regulation refers only to new cables that will be purchased after July 1, 2017.

Why would I need higher-grade fiber optic cables (B, C, D or E)?

§ Answer: for the safety of people in buildings.

Are chimneys or rooms subject to CPR? Do you need outdoor or indoor cables?

§ Answer: I am as stated by the manufacturer in the data sheet.

What does a communications operator have to do to comply with the CPR?

§ Answer: A communications operator has at least 3 essential things to be followed and respected:

· The project should include cable classes and project verification, which should include SR EN 50575: 2015

· Purchase of FO cables – must require suppliers of cables from the corresponding classes with CE marking and DoP’s

· At the Reception of the works the consistency of the work with the project, the quality certificates of the materials (cables) and the cable DoPs must be verified

– The major risk if nothing is done for the implementation of the CPR in Romania is that someone else (from IGSU or the producers of electric cables) to impose that in Italy all cables with fiber optic indoor be class B, fact which would greatly increase the costs (the prices for Euroclass cables vary exponentially from class E, D, C and B) for the implementation of the internal telecommunications networks

What are the CPR implementation solutions in Romania?

o Mrs. Bontea from MDRAP proposed as options for the implementation of CPR in Romania the following 3 variants:

§ Through ASRO: National application document of SR EN 50575: 2015

§ Through the MDRAP: update of the norm P118 / 1 (normative regarding the fire safety of the constructions) – estimation of time 1 year (the MDRAP has to auction again its preparation)

§ Through ANCOM and MCSI with the approval of the MDRAP: the technical norm in Law 159/2016 regarding the access to the infrastructure

o The participants agreed as the only solution feasible only through the MDRAP (update P118 / 1 and I18 / 1) and IGSU, possibly with the involvement or support of ANRE or the Ministry of Energy.

an OICPE proposed to discuss further with the Association of Cable

Workshop details

  • Period: 18 mai 2017
  • Location: Slatina
  • Participants: 21